Bahá'í Library Online
. . . .
.

Search for tag "Suez Canal"

from the chronology

date event locations tags see also
1869 17 Nov The Suez Canal was opened to navigation. At this time the canal was164km (102 miles) long and 8 metres (26 feet) deep, 72 feet wide at the bottom, and 200 to 300 feet wide at the surface. Consequently, fewer than 500 ships navigated it in its first full year of operation. Major improvements began in 1876 and by 1887 night navigation was allowed, a measure that doubled its capacity.
  • In the 1950s the waterway was substantially expanded, deepened and lengthened to accommodate the demands of shipping companies. By 1956 when Egyptian President Nasser nationalised it, the canal was 175km (109 miles long and 14 metres (46 feet) deep and could take takers with a capacity of 30,000 tonnes and a draft of up to 10.7 metres (35 feet)
  • A major expansion in 2015 increased the length to 193km (120 miles) and its depth to 24 metres (79 feet). Ships as large as 240,000 tonnes with a draft of 10 metres (66 feet) could be accommodated. Throughput was increased to 50 ships daily.
  • See 'Abdu'l-Bahá in Egypt pg96 for 'Abdu'l-Bahá's "The Spiritual Lesson Drawn from the Material Progress of Port Said and the Suez Canal".
  • Port Said; Egypt Suez Canal; Unity; Teaching
     
    See all tags, sorted numerically or alphabetically.

    See all locations, sorted numerically or alphabetically.

    Home Site Map Forum Links Copyright About Contact
    .
    . .